DOCUMENT LIBRARY
1. Construction Notices
- Public Notice – Temporary Closure (City of Toronto, Toronto Water project) (April 2020)
- Public Notice – Temporary Closure (City of Toronto, Toronto Water project) – Parking Restrictions (April 2020)
- EDT Construction Update- Phase 1 (February 2020)
- EDT Construction Update- Phase 2 (February 2020)
- EDT Construction Notice – Phase 1 (September 2019)
- EDT Construction Notice – Phase 2 (September 2019)
- West Don Parking Lot Improvement Project Construction Notice (June 2019)
- EDT Construction Notice – Phase 1 (May 2019)
- EDT Construction Notice – Phase 2 (May 2019)
- West Don Parking Lot Improvement Project Construction Notice (September 2018)
- EDT Construction Notice – Phase 1 (August 2018)
- EDT Construction Notice – Phase 2 (August 2018)
- EDT Construction Signage – Phase 1 (August 2018)
- EDT Construction Signage – Phase 2 (August 2018)
- East Don Trail – Phase 1 Design
- East Don Trail – Phase 2 Design
2. Fact Sheets
3. Maps
- East Don Trail – Bridges & Tunnels
- East Don Trail – Bridge Locations
- East Don Trail – Trail Map (June 2014)
- East Don Trail – Phase 1 Map
- East Don Trail – Phase 2 Map
- Proposed East Don Trail Alignment (June 2014)
4. Environmental Assessment Documents
- MOECC Decision Letter (August 2017)
- East Don Trail Environmental Assessment – Environmental Study Report (November 2016)
- East Don Trail Environmental Assessment – Environmental Study Report – Appendices (November 2016)
- LIST OF APPENDICES
- Appendix A: Public Consultation
- Appendix A1: Mandatory Notices and Other Notifications
- Appendix A2: Public Consultation – Part 1
- Appendix A2: Public Consultation – Part 2
- Appendix A3: Community Liaison Committee (CLC)
- Appendix A4: Indigenous Communities
- Appendix A5: Review Agencies
- Appendix A6: Key Stakeholders
- Appendix A7: Technial Advisory Committee (TAC)
- Appendix A8: Local Politicians
- Appendix B: Geomorphic and Geotechnical Existing Conditions
- Appendix C: Stage 1 & Stage 2 Archaeological Assessment
- Appendix D: Detailed Evaluation of “Alternatives To”
- Appendix E: Alternative Trail Alignments (Phase 2) – Evaluation Criteria, Indicators and Measures for Assigning Scores
- Appendix F: Alternative Design Concepts (Phase 3) – Detailed Environmental Inventory
- Appendix G: Alternative Design Concepts (Phase 3) – Evaluations Criteria, Indicators and Measures for Assigning Scores
- Appendix H: Preferred Alternative Existing Conditions Representative Photographs
- Appendix I: Electromagnetic Fields Management Plan
- Appendix J: Heritage Impact Assessment
- East Don Trail PIC#3 Presentation (June 2014)
- East Don Trail PIC#2 Presentation (September 2013)
- East Don Trail PIC#1 Information Sheet (February 2013)
MEDIA
Photo Galleries
Viewing the galleries:
Use arrow buttons to view before and after images. Select Read Now for full-screen view.
Phase 2 Walkthrough
General Images
Videos
Changes to the East Don Valley: 1942-2018
This video highlights some of the changes to the East Don Valley since 1942. Using aerial photographs, this video shows how the valley has changed and what has remained constant over the past several decades.